Chipboard floor in wash house requires replacing. In the corner of the room is a sink that is fixed to the floor.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Top job Mike, thanks
Work carried out by the owner/operator
Reviewed on 15-02-2013
Tradesperson reply
"Appreciate your response"
Partner with Builderscrack
Get work