Active job

Bathroom

Job description

General Building
Waikato

The chip floor has been affected by moisture. The floor needs replacing. Required 22 mm treated plywood and timber for bracing is available on site. The area is not large, but would expect to take 4 hours.


Trade professionals

#1 Tradie 1 No recent reviews 7 jobs No longer in contact
#2 Tradie 2 Not reviewed 0 jobs No longer in contact
#3 Tradie 3 No recent reviews 14 jobs No longer in contact
#4 Tradie 4 No recent reviews 0 jobs No longer in contact
#5 Tradie 5 No recent reviews 2 jobs No longer in contact
#6 Tradie 6 No recent reviews 4 jobs No longer in contact
#7 Tradie 7 No recent reviews 9 jobs No longer in contact
#8 Tradie 8 No recent reviews 2 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo