The job can be broken down into different tasks, and you can quote on each task or the whole project. The shed will be 9m x 12m The location is flat and level The steel faming of the building might be supplied, as it is available. It consist of 4 frames The cladding might be supplied Task1 - prepare the site for the concrete slab -- dig out a hole 11m x 14m upto a depth of max 400mm -- fill with pit sand in layers which are compacted in -- fill to 100mm above current level Task2 - erect slab forms - need to see your design Task3 - pour concrete to a min depth of 100mm, and smooth Task4 - Erect frames, and bolt it down to slab Task5 - Clad outside with Metalcraft or similar sheeting Task6 - Install guttering and pipe the water to a tank. -- Supply and install overflow to the roadside from the tank -- Provide quote for a 25000l water tank Lets have a discussion about how you would provide each task. Please remember that we need to cater for electricity inside the shed, as well as lighting.
#1 | Tradie 1 |
|
8 jobs | No longer in contact |
#2 | Tradie 2 |
|
104 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 0 jobs | No longer in contact |
#4 | Tradie 4 |
|
49 jobs | No longer in contact |
Partner with Builderscrack
Get work