Active job

MAXRaft concrete slab

Job description

General Building
Waikato

Our selected builder won't be available for another 3-4 weeks, so we're looking for someone to get our new build project started by getting the slab down for us. We're using the MAXRaft fully insulated slab system (see --- ), which is similar but not the same as Ribraft. MAXRaft is even simpler, requiring no boxing at all, and only minimal bracing to keep it in place during the pour. MAXRaft will install the polystyrene profiles themselves, so we just need someone to peg out the site for the excavator, set out the profiles, errect the bracing, and then tie and place the reinforcing iron ready for the pour, (and place and finish the concrete if you have proven experience). If you have experience with MAXraft or Ribraft slabs, are available within 1-2 weeks, and have good references, then we'd be interested in hearing from you. Slab size 148m2 Warrantee required


Trade professionals

#1 Tradie 1 No recent reviews 0 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo