New 105m2 house on extreme gradient-challenged cliffside site at Onetangi. 2 schemes sketched: (a) 6 20-foot shipping containers (can be pref-finished to "N" dgree, or supplied shell-only with windows for fit-out on site. To be placed by 80-ton crane on new driven-steel-pipe pile Meta-Anchor foundation. (b) similar layout in light-timber construction, pre-fab on on-site: also Meta-Anchor piles. Cash contract or JV agreement would be considered by architect/land owner.
#1 | Tradie 1 | No recent reviews | 4 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 5 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 13 jobs | No longer in contact |
Partner with Builderscrack
Get work