Labour only to construct app. 100 lineal metres timber retaining walls. The walls are each app. 1.5m high, then back fill then 1.8m from the edge the lower wall another wall is constructed on top. You will need to work in with excavator contractor. You will need to drill/excavate the holes for the poles. There are engineering drawings and a building consent granted for the work. Nova-flow drainage needs to be placed and sumps. (All provided).
#1 | Tradie 1 | No recent reviews | 1 job | Secured job |
#2 | Tradie 2 | No recent reviews | 1 job | No longer in contact |
#3 | Tradie 3 | No recent reviews | 9 jobs | No longer in contact |
#4 | Tradie 4 | Not reviewed | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work