Active job

Rebuild Decking Steps

Job image
Job image

Job description

Decking & Pergolas
Tauranga

The bottom step has been rebuilt and is solid but the others are needing to be rebuilt. They are fereing soft and the timber needs to be replaced. The 2nd two steps need to be converted to 3 to have them at an uniform height up to the landing. A handrail is also needed on the righthand side. No painting required, just your building skills


Trade professionals

#1 Tradie 1
7 jobs No longer in contact
#2 Tradie 2
72 jobs No longer in contact
#3 Tradie 3
3 jobs No longer in contact
#4 Tradie 4
6 jobs No longer in contact
#5 Tradie 5
4 jobs No longer in contact
#6 Tradie 6
2 jobs No longer in contact
#7 Tradie 7
11 jobs No longer in contact
#8 Tradie 8 Not reviewed 1 job No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo