Plumbing and drainage for one wall bathroom in new build shed including pre placement of necessary pipes before slab pour and then plumbing for a bathroom, including shower toilet and basin and hot water cylinder and connection of drains to septic drain 1 mtr from slab. Just about to head to consent, pour maybe within two months completion around Xmas. Water supply is also a meter from slab.
#1 | Tradie 1 |
|
76 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 1 job | No longer in contact |
Partner with Builderscrack
Get work