Require a new floor to be laid over exposed joists (original tongue and groove has been removed). Chipboard or particle board (room will be carpeted so not concerned with replacing wood). Underfloor insulation also needs to be added. One joist has borer damage to repair (or replace) against wall. Room is approx 3 x 5 m.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Very pleased with work, job was completed in a short time frame to a high standard.
Work carried out by the owner/operator
Reviewed on 30-03-2019
Tradesperson reply
"Thank you for your business."