Review

Install floor (plus underfloor insulation) and repair joist

Job image
Job image

Job description

General Building
Selwyn

Require a new floor to be laid over exposed joists (original tongue and groove has been removed). Chipboard or particle board (room will be carpeted so not concerned with replacing wood). Underfloor insulation also needs to be added. One joist has borer damage to repair (or replace) against wall. Room is approx 3 x 5 m.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Very pleased with work, job was completed in a short time frame to a high standard.

Work carried out by the owner/operator
Reviewed on 30-03-2019

Tradesperson reply
"Thank you for your business."

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo