Published: 20 July 2024
approximately 100m of timber pole and board retaining wall up to 1.5m and 20m of retaining wall up to 3m or possibly use a set-back multi-level in the higher areas and only 1.5m all around. Remove and relocate on site approximately 1000 cum of earth provide spreading and leveling of the moved earth to develop an orchard area with a slight slope Install stormwater control pipes in trench 50m with at least 2 sumps Level a new area by moving approx 60cum of earth to create a compacted site for new shed hard fill to develop the base will be provided by us, but need spreading and compacting on the build site
#1 | Tradie 1 | Not reviewed | 0 jobs | In contact |
#2 | Tradie 2 |
|
1 job | No longer in contact |
#3 | Tradie 3 |
|
5 jobs | No longer in contact |
#4 | Tradie 4 | Not reviewed | 0 jobs | No longer in contact |
#5 | Tradie 5 |
|
69 jobs | No longer in contact |
#6 | Tradie 6 |
|
1 job | No longer in contact |
#7 | Tradie 7 |
|
2 jobs | No longer in contact |
#8 | Tradie 8 | Not reviewed | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work