Active job

Reclad 2 storey house on pole platform

Job image

Job description

New Cladding
Rodney

Published: 20 July 2024

House built 2004 with Eterpan cladding and now very cracked and with internal guttering system on both levels that caused some water ingress yet to be fully evaluated. I have arranged scaffolding and plastic wrap and i have the weatherboards James Hardie Linea® 4200 x 180 x 16mm Weatherboard sufficient to cover the exterior wall area. We will contract separately the new guttering and downpipes but the soffit needs re-construction all around to allow for the installation of external guttering on new fascia All other materials and labour to be supplied by contractor on a pre-agreed schedule of costs. ground floor area 150sqm first floor area 125sqm garage 7mx7m attached by one wall


Trade professionals

#1 Tradie 1 Not reviewed 1 job In contact
#2 Tradie 2
9 jobs No longer in contact
#3 Tradie 3
4 jobs No longer in contact
#4 Tradie 4
8 jobs No longer in contact
#5 Tradie 5
55 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo