House built 2004 with Eterpan cladding and now very cracked and with internal guttering system on both levels that caused some water ingress yet to be fully evaluated. I have arranged scaffolding and plastic wrap and i have the weatherboards James Hardie Linea® 4200 x 180 x 16mm Weatherboard sufficient to cover the exterior wall area. We will contract separately the new guttering and downpipes but the soffit needs re-construction all around to allow for the installation of external guttering on new fascia All other materials and labour to be supplied by contractor on a pre-agreed schedule of costs. ground floor area 150sqm first floor area 125sqm garage 7mx7m attached by one wall