Published: 23 June 2022
We are in the middle of a bathroom reno and the builder we have has walked away with Covid etc. This will put him out for a while with his extended family and looking after them. We have demoed the bathroom, the concrete has been cut and the plumber is currently finishing their part. We will need someone to do the following Reinstate the concrete floor ready for the tiler Build the Soap box (I will have the wording wrong here) for the shampoo etc to sit on Build two small boxes for a foot to rest on Build a box for a TV control box. Line the room with Villa Board or Aqua Gib
#1 | Tradie 1 |
|
5 jobs | No longer in contact |
#2 | Tradie 2 |
|
3 jobs | No longer in contact |
#3 | Tradie 3 |
|
65 jobs | No longer in contact |
Partner with Builderscrack
Get work