Active job

Rebuild deck

Job description

General Building
Rodney

Published: 15 November 2013

I have a deck going off my lounge that juts out above the driveway. I have the plans already passed by council and have the permit issued. The deck has a steel frame which needs prepping as per plans and re constructing as per plans. The deck will have an open wood floor and will have glass panels all around. Its about 7m by 3 m and on the first floor. The house is cedar and brick and Ive had a quote of around 25-30k


Trade professionals

#1 Tradie 1 No recent reviews 7 jobs No longer in contact
#2 Tradie 2 No recent reviews 16 jobs No longer in contact
#3 Tradie 3 No recent reviews 1 job No longer in contact
#4 Tradie 4 No recent reviews 2 jobs No longer in contact
#5 Tradie 5
45 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo