Published: 4 September 2019
Refer to pictures to current state of garage, soon to have concrete work complete to stop water, then line garage (walls and ceiling) with gib, floor is approx. 220m2. For the exposed 1 bay, supply and fit temp wall of plywood (for security) and will replace this with a new front when we replace garage doors in time. Build shelving across back wall and work bench. I will arrange plastering and painting.
#1 | Tradie 1 |
|
152 jobs | No longer in contact |
#2 | Tradie 2 |
|
30 jobs | No longer in contact |
#3 | Tradie 3 |
|
19 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 9 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 28 jobs | No longer in contact |
#6 | Tradie 6 |
|
33 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 7 jobs | No longer in contact |
#8 | Tradie 8 | No recent reviews | 11 jobs | No longer in contact |
Partner with Builderscrack
Get work