Bathroom: Our current bathroom has a built in shower with 3 serotone walls and stainless steel base. We need the shower ripped out (there is one wall that will need to be pulled out) and a bath framed up and installed. The bath will have a shower over it. Laundry: We need a laundry tub installed. We also need the linen/hot water cupboard door removed and some sort of bifold doors put in its place to conserve space.
Workmanship |
4.0
|
Cost |
3.0
|
Schedule |
4.0
|
Communications |
5.0
|
Work carried out by a subcontractor
Reviewed on 05-08-2013
Partner with Builderscrack
Get work