Published on 29 January 2013
We have purchased a 3 bedroom relocatable home on a property in Algies Bay which we plan to lift and install a lower level beneath the existing upper level. We have building consent and are ready to start in April/May. We are seeking estimates to: 1. Lift the existing upper level. 2. Pour foundation and slab. 3. Construction of the structure for the lower level to lock up stage. 4. Construction of deck structure, and; 5 All necessary council approvals. Includes electrical wiring and service plumbing. More drawings are available if required. Materials to be estimated separately please?
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
4.0
|
Reviewed on 11 May 2017
Partner with Builderscrack
Get work