Review

Remove Coat Closet, Install Steel Beam and Fire

Job image

Job description

Other (Building)
Rodney

Published on 25 July 2009

Install +/- 6.1m x 250 PFC beam alongside existing as indicated in attached drawing Remove existing coat closet as indicated Remove existing laminate floor and tile to form entrance hearth Install client-approved log-burner fire c/w fixtures, fittings and flashings as appropriate by design Relocate existing light switch(es) to external wall. Retain existing ceilings, box around new beam and make good Site to be maintained in a safe, secure, clean and tidy condition at all times. Contractor responsible for removal and disposition of all waste All works to be conducted between --- weekdays only unless with the prior approval of the client


Review

Workmanship
5.0

John and all his team were prompt, polite, discreet and a joy to work with. I can't recommend them enough and won't hesitate to engage JdK for any future works.

Reviewed on 25 August 2009

Tradesperson reply
"A great job where everyone worked together to maintain progress schedule. A pleasure working for these clients."

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo