Install +/- 6.1m x 250 PFC beam alongside existing as indicated in attached drawing Remove existing coat closet as indicated Remove existing laminate floor and tile to form entrance hearth Install client-approved log-burner fire c/w fixtures, fittings and flashings as appropriate by design Relocate existing light switch(es) to external wall. Retain existing ceilings, box around new beam and make good Site to be maintained in a safe, secure, clean and tidy condition at all times. Contractor responsible for removal and disposition of all waste All works to be conducted between --- weekdays only unless with the prior approval of the client
Workmanship |
5.0
|
John and all his team were prompt, polite, discreet and a joy to work with. I can't recommend them enough and won't hesitate to engage JdK for any future works.
Reviewed on 25 August 2009
Tradesperson reply
"A great job where everyone worked together to maintain progress schedule. A pleasure working for these clients."