Active job

Replace bathroom floor

Job description

Other (Building)
Rodney

Published on 21 September 2012

Bathroom floor needs removing and floor boards either new or second hand need laying; Have not accurately measured as yet but area is about 4-5 m long and 2.5- 3metres wide and toilet and shower hot water cylinder are in the space. Other floor is matai but I do not necessarily have to match it if the job would be too expensive. Need an estimate of the cost; there would be other work as well to the outside replace some fibrolite and maybe also build a deck, and also a Double garage kitset build etc; First job would be floor and go from there. Builders labourer would be available to help if needed. Thanks


Trade professionals

#1
Tradie 1
unrated
2 jobs
No longer in contact
#2
Tradie 2
unrated
0 jobs
No longer in contact
#3
Tradie 3
unrated
53 jobs
No longer in contact
#4
Tradie 4
unrated
6 jobs
No longer in contact
#5
Tradie 5
unrated
1 job
No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo