Published: 22 August 2016
Hi there I have a home extention that has dropped (50mm approx in some places) that needs raising back in level with the rest of the house. The original house foundation is concrete, where as the extention is timber, which has dropped. I don't know what the meterage is but there is 2 double sized bedrooms and one with ensuit. If I were to guess, it would be 50M2 approx. Chipboard flooring. The extention was built approximately 30 years ago. Possible extra bearers may also be required. At 1st look, the joists are spanning quite a large area. Would be great if we can have it complete before May 2017 If you can help, I would love to hear from you. Cheers
#1 | Tradie 1 | No recent reviews | 31 jobs | No longer in contact |
Partner with Builderscrack