Active job

Re-piling Makarau

Job description

General Building
Rodney

Published: 22 August 2016

Hi there I have a home extention that has dropped (50mm approx in some places) that needs raising back in level with the rest of the house. The original house foundation is concrete, where as the extention is timber, which has dropped. I don't know what the meterage is but there is 2 double sized bedrooms and one with ensuit. If I were to guess, it would be 50M2 approx. Chipboard flooring. The extention was built approximately 30 years ago. Possible extra bearers may also be required. At 1st look, the joists are spanning quite a large area. Would be great if we can have it complete before May 2017 If you can help, I would love to hear from you. Cheers


Trade professionals

#1 Tradie 1 No recent reviews 31 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo