Original construction had a garage plan but somehow it was not built. At this stage, we need a design to build an internal two car garage and then possibly finish a half-way construction to the concrete job so that at least we can park our cars outside of future garage. Since the parking lot that we want to use is a kind of hill covered with lawn, I think this soil should be removed in the beginning.
#1 | Tradie 1 | No recent reviews | 2 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 1 job | No longer in contact |
#3 | Tradie 3 | Not reviewed | 0 jobs | No longer in contact |
#4 | Tradie 4 | Not reviewed | 0 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 1 job | No longer in contact |
#6 | Tradie 6 |
|
12 jobs | No longer in contact |
Partner with Builderscrack
Get work