Active job

Two car garage

Job description

General Building
Palmerston North

Original construction had a garage plan but somehow it was not built. At this stage, we need a design to build an internal two car garage and then possibly finish a half-way construction to the concrete job so that at least we can park our cars outside of future garage. Since the parking lot that we want to use is a kind of hill covered with lawn, I think this soil should be removed in the beginning.


Trade professionals

#1 Tradie 1 No recent reviews 2 jobs No longer in contact
#2 Tradie 2 No recent reviews 1 job No longer in contact
#3 Tradie 3 Not reviewed 0 jobs No longer in contact
#4 Tradie 4 Not reviewed 0 jobs No longer in contact
#5 Tradie 5 No recent reviews 1 job No longer in contact
#6 Tradie 6
12 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo