I have a almost rebuild house being recladed with all council inspections etc. Looking for a price on rondo and gib installation in about 6-8 weeks see attached plans, studd is 2.7 meters. Rondo is: 16mm clipped system with perimate angle.
#1 | Tradie 1 |
|
92 jobs | No longer in contact |
#2 | Tradie 2 | Not reviewed | 0 jobs | No longer in contact |
#3 | Tradie 3 |
|
2 jobs | No longer in contact |
#4 | Tradie 4 |
|
14 jobs | No longer in contact |
#5 | Tradie 5 | Not reviewed | 0 jobs | No longer in contact |
#6 | Tradie 6 |
|
2 jobs | No longer in contact |
#7 | Tradie 7 | Not reviewed | 0 jobs | No longer in contact |
#8 | Tradie 8 | Not reviewed | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work