I have a small bathroom where the plaster & paint are dropping off. This is due to having 1960's fibre-board in some areas of the bathroom, these need to be replaced with Aqualine so they can be plastered & painted. Very small 60's bathroom. Hoping this can be done in next week or two. Have a plasterer lined up but if fixer wants to plaster job as well happy for that. Have electrician who can disconnect bathroom.
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 23-12-2023
Partner with Builderscrack
Get work