Published on 25 January 2024
Replace existing footbridge across the stream onto the walkway. Short span bridge on private land, no public access. Replace with hand rails (included an image to replicate) Work scope includes, - 4x New --- Piles with 300mm Diameter foundations drilled 1.2m deep c/w 20MPa concrete footings - --- PG Joists @ 400 ctrs max. c/w Stainless steel M12 bolt connections to piles. - 140x32mm H3.2 Pine grip tread decking to form board walk - 90x90 H5 Barrier Posts @ 1m ctrs c/w Stainless steel M12 bolt connections - (2x) 90x32 & (1x) 140x32 Grip tread decking smooth side facing in to form barrier rails. I am keen to assess quotes and availability etc. Thank you.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Sam was very responsive, understood what we wanted which was to replace the small foot bridge and he delivered on the time within reasonable pricing. Very happy with his work and would consider for other jobs.
Work carried out by the owner/operator
Reviewed on 6 March 2024
Partner with Builderscrack
Get work