Review

Foot bridge

Job image
Job image
Job image
Job image
Job image
Job image

Job description

Decking & Pergolas
New Plymouth

Replace existing footbridge across the stream onto the walkway. Short span bridge on private land, no public access. Replace with hand rails (included an image to replicate) Work scope includes, - 4x New --- Piles with 300mm Diameter foundations drilled 1.2m deep c/w 20MPa concrete footings - --- PG Joists @ 400 ctrs max. c/w Stainless steel M12 bolt connections to piles. - 140x32mm H3.2 Pine grip tread decking to form board walk - 90x90 H5 Barrier Posts @ 1m ctrs c/w Stainless steel M12 bolt connections - (2x) 90x32 & (1x) 140x32 Grip tread decking smooth side facing in to form barrier rails. I am keen to assess quotes and availability etc. Thank you.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Sam was very responsive, understood what we wanted which was to replace the small foot bridge and he delivered on the time within reasonable pricing. Very happy with his work and would consider for other jobs.

Work carried out by the owner/operator
Reviewed on 06-03-2024

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo