Published on 29 March 2015
Cut existing paving, 7,7 metres, and install Hynd pre sloped light residential top channel, PE mesh grating. Tie outlet into existing stormwater pipe. Ensure channel is completely sealed to house and existing paving
Partner with Builderscrack
Get work