Layout house onto section. Then assist with 10-15 days to get the kit set house to lockdown stage. Maybe longer if more finishing work required Construction is Structural Insulated Panels. Job to be ready March 2021 onwards.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Pete was very receptive to my ideas and project. Such an attitude was welcomed as other tradespeople didn’t show the same enthusiasm for the work. His approach was very professional and this behaviour was reflected once on site. I would certainly recommend him.
Work carried out by the owner/operator
Reviewed on 23-09-2020
Tradesperson reply
"Thankyou for such a positive review, we really appreciate it. We aim for professionalism in all aspects of the service we provide to our clients and we're pleased that once again we hit our target.
Cheers
Pete
Owner
Apex Consruction"
Partner with Builderscrack
Get work