Posted 15 years ago
Heath
Other (Building)
Masterton
BATHROOM
We have fittings from walls out.
Just need someone to put in the plastic shower linner, plastic shower tray, take down one shower wall (900mm) Transfer the shower fittings from this wall to existing internal wall. Put up the rail (from the ceiling for the shower curtain to hang off).
Take out old vanity and put in new vanity.
Take out old laundry tub, put in new tub.
Tile floors.