Building inspection conducted and two repairs are required. Details of repairs and checks required are attached. Item 1: Ceiling in the kitchen adjacent to rainhead requires repair Item 2: Invasive testing of ground to cladding clearance in garage south/east corner to determine if there is damage and repair as required. Repairs need to be completed by 30 of July. Thanks in advance
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
On time, professional, knowledgeable, reliable and very well priced. Will definitely recommend and continue to use when required.
Work carried out by the owner & subcontractors
Reviewed on 14-08-2019
Tradesperson reply
"Thanks Farah You have been awesome to work for."