I need a site cleared and levelled in prep for a garage. Most likely involve a digger and bobcat, and removal of dirt, some green waste and stones. If keen, also need a retaining wall in place. Even further a pad for the garage. As per the photos, garage will be sited with door parallell to the driveway, up the drive then turn left, current stone bank to be dug out and retaining wall built, and site levelled.
#1 | Tradie 1 | No recent reviews | 1 job | No longer in contact |
#2 | Tradie 2 |
|
115 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 13 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 143 jobs | No longer in contact |
#5 | Tradie 5 |
|
16 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 43 jobs | No longer in contact |
#7 | Tradie 7 |
|
373 jobs | No longer in contact |
#8 | Tradie 8 | No recent reviews | 1 job | No longer in contact |
Partner with Builderscrack
Get work