1. Internal wardrobes removed (old jib board and trim already removed, just framing remains) 2. New flooring installed where build in wardrobes were 3. Some adjustments to existing wall framing maybe required 4. Insultation installed where possible 5. Service hatch installed to allow future access to pumping, as bathroom is adjacent to the bedroom. 5. Jib board installed, 6. New base board installed that match existing All new electrical work has been completed. No plastering work required. Job is available now to be completed.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Excellent and very thoughtful
Work carried out by the owner/operator
Reviewed on 23-09-2021