Looking to move my sleep-out from the lawn area in front of my dwelling, to a new location beside the dwelling. This will require excavation into a shallow slope, construction of a retaining wall around the excavation, installation of piles in the new location and moving the sleep out (overall footprint of 4.1 x 3.4 x 3.3m). The sleep-out will require electrical reconnection. Estimate that the work will be required to be undertaken in approximately 3-4 months time Photos 1 and 2 show the sleep-out in its current location Photo 3 is taken from the front of the sleep-out and shows the area of relocation Photos 4, 5 and 6 show the shallow slope in the area of relocation which will require excavation and construction of a retaining wall
#1 | Tradie 1 |
|
279 jobs | No longer in contact |
#2 | Tradie 2 |
|
18 jobs | No longer in contact |
#3 | Tradie 3 |
|
33 jobs | No longer in contact |
#4 | Tradie 4 |
|
25 jobs | No longer in contact |
Partner with Builderscrack
Get work