4 bedroom house needs as much finished as possible. 2 bedrooms need insulation installed and ceilings hung. Kitchen floor needs fixing (it’s not level for tiles) and tiles laid. Kitchen cabinets need installing. Bathroom floorboards need patching. Build deck (basically the height of a step). En-suite depending on cost. Possible fencing. Fix outside wall (as although I’d paid someone to do this and they’ve taken off with half the money).
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Brook installed new gib ceilings in my front rooms, put new timber framing up as well. Was awesome to deal with and managed to fit my job in between other work. Very happy with his work, and would have him back for other jobs. Thanks Brook!
Work carried out by the owner/operator
Reviewed on 21-11-2021
Partner with Builderscrack