I have had the front door shifted about a metre so I need another front landing. It could be done in decking timber, or a thicker plywood. I need one step down as the height is about 300 off the ground.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Will use this crew again
Work carried out by the owner & subcontractors
Reviewed on 29-12-2021
#1 | Tradie 1 |
|
49 jobs | Secured job |
#2 | Tradie 2 |
|
33 jobs | No longer in contact |
#3 | Tradie 3 |
|
10 jobs | No longer in contact |
Partner with Builderscrack
Get work