Install 4 wall frames including 4 prehung doors. Bottom boards need to be fixed to a concrete floor. All waste can be left on site. Some demolition will also be required. All materials provided except for concrete screws/nails and the nails required to fix frames in place. Essentially rebuilding the hallway and bathroom wall. Wall 1 - 4000 x 2800 with 2 doors Wall 2 - 2700 x 2800 with 2 door (1 is a cupboard) Wall 3 - 3300 x 2800 All wood and pre hung doors will be on site.
#1 | Tradie 1 |
|
19 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 1 job | No longer in contact |
#3 | Tradie 3 |
|
74 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 0 jobs | No longer in contact |
#5 | Tradie 5 |
|
45 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 18 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 1 job | No longer in contact |
#8 | Tradie 8 |
|
22 jobs | No longer in contact |
Partner with Builderscrack
Get work