Published on 22 March 2019
one living room in old house, 2.7 m stud, now back to trued-up framing; require gib fixed (hung), stopped, trimmed (2 doors, 1 window), sealer coat paint. 17 sheets of 2.7 gib are on site. Need completed by 12 Apr - straight forward job but I have run out of time.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
4.0
|
Communications |
5.0
|
Grfeat guys, excellent job - it was gibbing an old out-of-square house so took more work than planned; they did a lot of extra patching for very reasonable cost. I highly recommend HD Plastering
Work carried out by the owner/operator
Reviewed on 21 April 2019
Partner with Builderscrack