Replace boards, hand railing, steps on upper level of deck (approx 2x4m). Modify lower deck, replace boards, add seats and steps (approx 3x4m).
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Really happy with the deck, it looks great!
Work carried out by the owner/operator
Reviewed on 25-10-2011
Tradesperson reply
"Thanks guys all too easy"
Partner with Builderscrack
Get work