We have been advised by the person who did our building report we require additional timber support under the shower. We don't know anything about this sort of stuff but I've attached below what was said by the building inspector: "An additional timber support is required under the shower as a floor joist has been joined in this location – the new timber should be installed beside the joint and span between the bearers." We currently have foil under the house but are wanting to upgrade to insulation, and we would ideally like to get this done before the insulation. Thanks!
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Ben was great, so friendly and helpful, actually explained what needed to be done and did it very efficiently and did a really great job. I would highly recommend him to anyone else! Thanks so much Ben!
Work carried out by the owner/operator
Reviewed on 14-02-2021
Tradesperson reply
"Thanks Ye
Glad to get it fixed for you and appreciate your business.
Ben"