Moving business to a new building. I need built: a 3m x 2m sound rated room for a recording studio, a 2m x 2m network room, a 6m wall partition (sound rated), 20m of wall partition, 26m of supplied ceiling track mounted glass wall partitions. The building has suspended ceilings and the floor height is 3m. Recording studio must be built by end of June, but also network room and boardroom if possible. Rest of partitions/glass in July.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Clayton and his team were awesome. He understood the unique requirements of our project immediately, and made insightful suggestions. Work was high quality, squeezed into a right timeframe, fitted in an on the spot unrelated extra that we needed, and we're really pleased with the finished job.
Work carried out by the owner/operator
Reviewed on 22-08-2020
Tradesperson reply
"Thank you for the great feedback.
All the best."
#1 | Tradie 1 | No recent reviews | 2 jobs | Secured job |
#2 | Tradie 2 |
|
30 jobs | No longer in contact |
#3 | Tradie 3 |
|
15 jobs | No longer in contact |
#4 | Tradie 4 |
|
4 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 103 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 4 jobs | No longer in contact |
#7 | Tradie 7 |
|
46 jobs | No longer in contact |
#8 | Tradie 8 |
|
81 jobs | No longer in contact |
Partner with Builderscrack
Get work