Review

Shift door position in structural wall

Job image

Job description

General Building
Christchurch

This is the door to my kitchen, I need it moved along the wall approximately 400mm to the right. This is also a structural wall. I would also like the lintel put a little higher than the current door so I can have a more standard size door installed. Feel free to also quote for the supply and install of a new door. Note also that the wall linings will be off when this job is happening as I am having asbestos removed from the walls. (So you won't have to remove or reinstate wall linings.) Wires will have been shifted out of the way by an electrician. I would ideally like to have this job done in late May.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Friendly, professional, and reasonably priced.

Work carried out by the owner/operator
Reviewed on 30-05-2019

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo