Published on 20 November 2024
A new entrance/front door and hallway to be added to a self contained sleepout (existing front door location is not suitable). Lounge walls have been stripped, need to be jibbed. New flooring to be laid in existing kitchen, vinyl at present
Partner with Builderscrack
Get work