We would like to replace and lift the existing deck 6m x 3.5m approx. With steps at each end. There are 5 12v lights that will need to stay. The current deck has been nailed down with a nail gun. We do NOT want this, proper deck nails please. We would like the deck raised to meet the outside door level so we can wheel out the telescope.
#1 | Tradie 1 |
|
6 jobs | No longer in contact |
#2 | Tradie 2 | Not reviewed | 0 jobs | No longer in contact |
#3 | Tradie 3 | Not reviewed | 0 jobs | No longer in contact |
#4 | Tradie 4 |
|
13 jobs | No longer in contact |
#5 | Tradie 5 |
|
12 jobs | No longer in contact |
#6 | Tradie 6 | Not reviewed | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work