Active job

Bathroom renovation

Job description

Other (Building)
Auckland

Published on 7 November 2007

BATHROOM 1) Bath - Install (Replacing current shower with bath) 2) Shower only (eg over bath) - install 3) Toilet - Install 4) Vanity - Install 5) New flooring - Tile floors - Approx 5 m2 Tiling floor and up and over bath 6) New wall linings - Tiling 14.5m2 Toilet and Vanity is a straight replace no changes to pipework. Flooring will need some prep as shower floor will need to be replaces (currently tiled shower some small amounts of rot around the shower in the tawa floorboards.


Trade professionals

#1
Tradie 1
unrated
1 job
No longer in contact
#2
Tradie 2
unrated
1 job
No longer in contact
#3
Tradie 3
unrated
3 jobs
No longer in contact
#4
Tradie 4
unrated
1 job
No longer in contact
#5
Tradie 5
unrated
1 job
No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo