We have 3 sets of mailboxes that need to be removed and reinstalled into a romm with concrete walls. There will be 16 mounts, the current screws are hex bolts. 2 sets of the mailboxes (the smaller ones) need holes drilled through the back of the stainless steel. That 10 holes through stainless. WOuld be a job for 2 people. Tools required : trolley jack (to hold the units up while installing, a level, a hammer drill and drill bits for masonary and metal. 16 hex Screws suitable for concrete, perhaps chemset to hold in place. Estimate its a 2 person job and will take 2-3 hours to complete. Needs to happen W/C 16 May
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great working with Sam, was very accommodating, came prepared, did a good job.
Work carried out by the owner/operator
Reviewed on 22-06-2022
Partner with Builderscrack