What is needed: -Carefully pull out drop-in bath-tub (nb this is glued in place so a bit tricky). -Remove faulty bath-frame (try to preserve tiles as much as possible) -Water-proof the area between the bathtub and frame -Rebuild bath-frame as per manufacturer's instructions (see pdf attached) -Put bath in level. -Gibbing must allow for tiles to sit under the lip of the bath-tub Other things: This bath-tub was placed incorrectly first off, and an attempt was made to fix it again without success. We are really keen to get this sorted as 2 small kids and no functional bath-tub. Only experienced builders please. You will also have a careful and tidy approach to the job. Central Auckland location.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great work, much appreciated
Work carried out by the owner/operator
Reviewed on 12-02-2019
Partner with Builderscrack
Get work