Review

Pull out bathtub and old bath frame, rebuild new bath frame, drop in bath.

Job image
Job image
Job image
Job image
Job image
Job image
Job image
Job image
Job image
Job image
Job image
Job image

Job description

General Building
Auckland

What is needed: -Carefully pull out drop-in bath-tub (nb this is glued in place so a bit tricky). -Remove faulty bath-frame (try to preserve tiles as much as possible) -Water-proof the area between the bathtub and frame -Rebuild bath-frame as per manufacturer's instructions (see pdf attached) -Put bath in level. -Gibbing must allow for tiles to sit under the lip of the bath-tub Other things: This bath-tub was placed incorrectly first off, and an attempt was made to fix it again without success. We are really keen to get this sorted as 2 small kids and no functional bath-tub. Only experienced builders please. You will also have a careful and tidy approach to the job. Central Auckland location.


Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo