Published on 22 October 2018
I would like a small ceiling (225x94) built to cover up some heatpump ducts. I have attached some photos of the work that needs to be completed. A summary is as follows: 1. A ceiling frame should be built to fit the dimensions shown -The frame should be built as high as possible - The ceiling is to be insulated (insulation provided) 2. Ceiling Gib should then be installed 3. On one end of the ceiling an angle should be build as depicted 4. Skirting should be installed My estimation is that the work should take around half a day to a full day
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Very responsive and accommodating to customer needs. Quality workmanship; would not hesitate to use again.
Work carried out by the owner/operator
Reviewed on 31 October 2018
Partner with Builderscrack
Get work