Active job

Triumph office.

Job description

General Building
Auckland

We require partition walls to be built in an open plan office area. In a first floor area: One wall will be 7.5M long and requires two doorways, one single and one double. A second office divider is a 4M long wall with no openings or doorways. Another existing doorway needs to be blocked off. In the ground floor area: An existing dividing wall needs to be removed. Then a 14M wall will need to be constructed, with two 4M dividing walls built off it. There will need to be three double door entries, one to each section. We also require a door installed into an existing internal wall. This would ideally need to be completed early August.


Trade professionals

#1 Tradie 1 No recent reviews 8 jobs No longer in contact
#2 Tradie 2
305 jobs No longer in contact
#3 Tradie 3 No recent reviews 25 jobs No longer in contact
#4 Tradie 4
332 jobs No longer in contact
#5 Tradie 5 No recent reviews 59 jobs No longer in contact
#6 Tradie 6 No recent reviews 42 jobs No longer in contact
#7 Tradie 7
21 jobs No longer in contact
#8 Tradie 8 No recent reviews 26 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo