Job in two parts: 1. remove bricks (down path, to left of white line, against retaining wall) 2. After trench work by drain-layers, re-lay bricks to match existing brick-work.
#1 | Tradie 1 |
|
85 jobs | No longer in contact |
#2 | Tradie 2 |
|
22 jobs | No longer in contact |
Partner with Builderscrack
Get work