Our front wall - double brick - is subsiding because of the pressure of earth behind the wall. It needs to be rebuilt with a new footing. There will be some excavation required behind the wall too. This job may also include relaying brick steps that lead up to the house from the wall. The wall is currently approx 1.8m high and I feel it could be rebuilt a bit lower. The wall is in two equal sections of approx 4m. The steps go up to the house between the two sections on the wall. I would like to have this done in February if possible.
Partner with Builderscrack
Get work