I want to create an area to place pool equipment. I have drawn a scale design that will fit all the equipment (pump, filter, controller, chemicals, heat pump) I will need the excavation completed to the correct levels, rebar positioned for blockwork as appropriate, a concrete base poured, and blockwork laid on top. I will arrange a drainlayer to relocate the stormwater pipe, and link up with a new drain that will go on the floor of the new pump shed. I also want to install --- timber piles inline with existing piles for a deck extension in the future to go over the top. This will need to be done before the concrete base is poured.