Post job.
Choose tradie.
Easy.

With thousands of tradies across NZ, Builderscrack has your job covered

Blockwork for pool pump shed

Job photos

Job description

open
Posted 1 week ago

I want to create an area to place pool equipment.

I have drawn a scale design that will fit all the equipment (pump, filter, controller, chemicals, heat pump)

I will need the excavation completed to the correct levels, rebar positioned for blockwork as appropriate, a concrete base poured, and blockwork laid on top.

I will arrange a drainlayer to relocate the stormwater pipe, and link up with a new drain that will go on the floor of the new pump shed.

I also want to install --- timber piles inline with existing piles for a deck extension in the future to go over the top. This will need to be done before the concrete base is poured.

Tradespeople

Tradie #1 58 jobs In contact
Tradie #2 64 jobs In contact
Ready to get started? Post your job.
Get started now! Post your job for free and find the right tradie. Post your job for free, now!