18m of block retaining wall across the site. Will be backfilled against, so wont be seen. Job is to lay blocks on top of footer (footer will be done by builder), d12 starters every 400mm horizontally and vertically. 200 series blocks will be on site with d12 steel.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Awesome work - was patient with us when the footer got rushed and was a bit shit :-D The type of blockies that you want on your worksite :-)